Management of the delivery of an exciting new leisure facility in the centre of Carlisle
Sands Centre
A new modern leisure and events facility at the existing Sands Centre in Carlisle has provided an eight-lane swimming pool, learning pool with moveable floor, wet and dry changing facilities, a four-court sports hall, an NHS physiotherapy suite, a 120-station fitness suite including studios, a bar and a café.
I’m delighted that work has been completed on The Sands Centre redevelopment and would like to pass on my thanks to our project team, partners and contractors.
Councillor John Mallinson
Leader of Carlisle City Council
Our approach
In support of this project, our team was involved from an early stage when we reviewed and built upon the business case before steering the project through design, planning and procurement.
The events centre needed to remain operational throughout construction, requiring steps to be taken to minimise disruption. We worked proactively with the council, its stakeholders, the design team and the contractor to instil an ethos of collaboration and communication when discussing designs and agreeing construction stage logistics.
Significant budget pressures were encountered during the feasibility stage and then during the detailed design stage, requiring significant efforts to be made to control costs.
Through a series of stakeholder engagement activities, we and the wider team proactively responded to queries from gym members and groups who use the centre, and from people living near the centre ahead of the planning application being submitted. Comments were received and changes were incorporated, some of which proved to be commercially viable to the leisure centre operator.
Our approach also included explaining where stakeholder requests were made that could not be incorporated, such as the inclusion of a climbing wall or for the main pool tank to have a constant depth of 2m.
Focusing on cost efficiency, we interrogated the contractor's costs to identify where savings could be made without compromising the brief or the mix of facilities provided. For example, a section of the frame was changed from a glulam system to structural steel to save costs.
Sharing ground with an events space and connected by a bespoke internal street with a cafe, The Sands Centre is a dynamic offering for the local and regional community. The space encompasses three bars, one of which overlooks the River Eden, and the exercise studios can also be converted for use as conference facilities.
As the centre is located within a level 3 flood zone, close collaboration between the project team was crucial to ensure flood resilience throughout design and construction. Along with the council and Wates Construction, we worked closely with the Environment Agency on a separate planned project that was being undertaken at the same time, which raised the height of the flood defence wall surrounding The Sands Centre.
The project was imbued with social value in the construction programme, with local employment opportunities maximised through the supply chain alongside training for young people.
Key info
Client
Carlisle City Council
Status
Complete
Management
Cost and commercial management, Project and programme management
Sector
Sport and leisure
Location
Cumbria